A blog of projects, work done, and general miniature railway stuff
Tuesday, 5 May 2015
Fairlie close . . . .
Recently, I've been doing some last jobs I need to do before sending the Fairlie parts to the sprayer for paint. This has included a lot of rubbing down of the welded surfaces to get a nice smooth finish, which, although dirty and hard work, will make the loco look so much better when she is done. I am hoping to be able to make an appointment with him in the next week or so, hopefully he can fit her in quickly.
Monday, 6 April 2015
A lot has happened since my last post here. Much work has been done on the power bogie, especially making sure that it can pivot enough in both vertical and horizontal planes while also getting steam to and from it.
The boiler has been put on the frames, and a lot of platework has been done. Hopefully soon it will be time for paint . . .
The boiler has been put on the frames, and a lot of platework has been done. Hopefully soon it will be time for paint . . .
Thursday, 30 October 2014
Fairlie frames erected at last!!
Today was a very special day, now that the tink has gone, there's plenty of room in the shed so the fairlie got the rear section of its frames bolted on at last. The rear bogie bolster was also fixed in place, so she is on all 8 wheels at last.
I also fixed the reverser and brake stand in position. Jobs in the coming days include hooking up the brakes and reverser, and fitting the footwell. I am especially happy with the widened rear section, there's so much more space in there than normal.
I also fixed the reverser and brake stand in position. Jobs in the coming days include hooking up the brakes and reverser, and fitting the footwell. I am especially happy with the widened rear section, there's so much more space in there than normal.
Sunday, 26 October 2014
Tink number 3 - done!!!
Yesterday I delivered my third tink to her new owner. Both he and I are very pleased with the looks of this loco, it's turned out really well. And now, it's fairlie time. . . . .
Wednesday, 20 August 2014
August update
The tink platework is now done and the first lot has gone to the sprayer for him to do his magic. Once that paint has hardened I can start the job of lining her. Her smokebox has been fitted out (blast pipe and cap, spark arrestor, blower feed, elbow for ejector exhaust etc.) and then painted, and I've also painted the frames and buffer beams.
I have also decided to abandon my plan of having the big chime whistle on the front of one of the fairlie tanks (in place of the drivers side sandpot) and so have got more lumps of aluminium to make a second sandpot from.
I have nearly completed the firehole doors for both locos, frames from 25x25x3 angle.
I have also decided to abandon my plan of having the big chime whistle on the front of one of the fairlie tanks (in place of the drivers side sandpot) and so have got more lumps of aluminium to make a second sandpot from.
I have nearly completed the firehole doors for both locos, frames from 25x25x3 angle.
Sunday, 15 June 2014
Tinkerbell progress
The tinkerbell I am building for a client has progressed a lot recently. I have welded up the tanks, bunker and cab roof (in two section so he can remove the rear one). I still have to make up the coal rails for the bunker, and do some filling here and there, but she's nearly ready for paint.
Friday, 9 May 2014
Fairlie too . . .
The Fairlie's coming on too. I have also welded up her tanks, which are a complex shape to mimic her big sister.
Subscribe to:
Posts (Atom)